A contract miner supplies the crews, fleet, supervision and usually the consumables to move rock on someone else's title. The main shapes are contract open-pit mining — drill and blast, load and haul, dozer push, grade control support — and contract underground mining, which splits into development (decline and lateral drives, ground support, services installation) and production (stoping, bogging, backfill), plus specialist shaft sinking and raise development that very few firms can do at all. Alongside the ore-moving work sits the earthmoving family: overburden stripping and prestripping campaigns to expose ore ahead of the mining schedule, haul road and access road construction and maintenance, and bulk earthworks for plant pads, water storages, diversion channels, waste dump construction and tailings embankment lifts. The distinction that matters commercially is between a contractor engaged to hit a production target and one engaged to supply hours and machines: the first is a mining contract, the second is plant hire with a driver.
18 firms working in this trade
Alphabetical. Nobody paid to be here
- Ames ConstructionBurnsville, Minnesota
Pre-production stripping, turnkey mine development, contract mining and reclamation
amesconstruction.com - Bemas ConstructionEnglewood, Colorado
Overburden removal, pit reclamation and bulk earthwork for mines
bemas.net - Brubacher ExcavatingBowmansville, Pennsylvania
Overburden removal for surface coal mines and limestone quarries
brubacher.net - Cementation USASandy, Utah
Underground mine contracting, shaft sinking, raise boring and engineering
cementation.com - CoreTerTonopah, Nevada
Silver mining across sites in Nevada and California, with a certificated crusher plant at Keystone
coreter.com - Cowin & CompanyBirmingham, Alabama
Mine shaft construction, raiseboring, tunnels, slopes and highwall stabilization
cowin-co.com - Frontier-Kemper ConstructorsEvansville, Indiana
Conventional shaft sinking, raise boring, blind drilling and slope construction
frontierkemper.com - Harrison WesternLakewood, Colorado
Underground mine development, shaft sinking, remediation and contract mining
harrisonwestern.com - KiewitOmaha, Nebraska
Full-service contract mining, mine operations, maintenance and infrastructure development
kiewit.com - Miller Contracting ServicesCarrier Mills, Illinois
Mine portals, declines, shafts, hoisting systems and ventilation construction
millercontracting.us - North American DrillersMount Morris, Pennsylvania
Drills ventilation and access shafts up to 20 feet diameter
nadrillers.com - North American MiningPlano, Texas
Dragline and surface mining operations for aggregates and lithium
namining.com - RedpathSparks, Nevada
Shaft sinking, mine development, raiseboring and underground construction
redpathmining.com - RWS ResourcesHenderson, Kentucky
Underground mining contractor: jackleg drilling, ventilation controls, belt installation
rwsresources.com - Shaft Drillers InternationalMount Morris, Pennsylvania
Large-diameter blind shaft drilling and ground stabilization for mines
shaftdrillers.com - Small Mine DevelopmentBoise, Idaho
Underground hardrock mine development and contract production mining
undergroundmining.com - Thyssen MiningLas Vegas, Nevada
Shaft sinking, underground mine development and contract mining
thyssenmining.com - W.W. ClydeOrem, Utah
Contract mining, overburden removal, heap leach pads and tailings dams
wwclyde.net
Listed because we found them, not because they asked or paid. Every entry was checked against the company’s own website; none of it is an endorsement, and we have no commercial relationship with anyone on this page. Work in Contract mining and earthmoving and want to be added, corrected or removed? Tell us — it is free either way.
The methods, and when each is used
What each technique is for, what defines it, and where it fails
Open pit bench mining
The workhorse surface method for near-surface, massive or thick-bedded metal and industrial mineral orebodies where the deposit is too large or too irregular to strip in a single cut. The pit is cut as a series of horizontal benches worked downward; overburden and waste are hauled out to external dumps rather than cast into the adjacent cut, which is what separates open pit from strip mining. Suits steeply pitching or bulk disseminated orebodies (porphyry copper, iron, aggregate, diamonds). Selectivity is moderate: the mining unit is a blasthole-pattern block, typically one bench height thick, so ore and waste can be separated on dig lines but not below blast-block scale. Dilution comes mainly from blast movement across the ore/waste contact and from the loader's inability to follow a contact finer than the bucket.
Specification, and where it falls down
SpecificationBench height typically 20 to 50 feet (Penn State MNG 230 teaching range). Bench geometry terms are defined off the bench floor (horizontal surface), bench face (vertical surface), face angle (average angle the face makes with the horizontal), toe (intersection of bench face and bench floor) and crest (intersection of bench floor and bench face); bench width is crest to toe measured along the upper surface. Haul roads are built to a gradient of up to 15 percent. Safety or catch benches are left to collect sliding material from the benches above and stop large rock pieces. A safety berm of broken material is built along the crest as a guard rail. Stripping ratio is computed as waste blocks divided by ore blocks. Typical practice, not a published standard: bench height is picked to suit the loading unit and the drill, and waste:ore ratio rises sharply as the pit is pushed out over a steeply pitching orebody.
Where it falls downStops working when the stripping ratio needed to expose the next increment of ore exceeds what the ore value will pay for; the course notes that as a pit expands over a steeply pitching orebody the overall stripping ratio increases dramatically and unit cost rises with depth because material is hauled farther. Wall angle is set by geotechnical conditions, and under 30 CFR 56.3130 mining methods must maintain wall, bank and slope stability where persons work or travel, with bench width and height based on the equipment used to clean benches or scale walls. 30 CFR 56.3131 requires loose or unconsolidated material to be sloped to the angle of repose OR stripped back for at least 10 feet from the top of the pit or quarry wall; the two are alternatives, not a single stripping requirement.
sourceStrip mining / open cast (area mining with dragline)
For flat-lying bedded deposits under shallow cover, overwhelmingly coal and some phosphate. The defining feature is that the overburden is not hauled to a waste dump: it is cast or stripped directly into the adjacent mined-out cut, so the pit walks across the property in successive strips. Area mining is the flat-terrain version. Selectivity is low over the waste but high over the seam: once the seam is exposed it is cleaned and loaded on its own floor and roof, so ore loss and dilution are governed by how cleanly the dozer and loader trim the seam top and bottom rather than by blast-block resolution.
Specification, and where it falls down
Specificationaustralian practice, from Mitra and Saydam, Surface Coal Mining Methods in Australia (IntechOpen, 2012), not a US published standard: dragline strips are typically 40 to 90 m wide and a few kilometres long, draglines can excavate a maximum of about 50 to 80 m of overburden owing to reach and dump height limits, and the method suits gently dipping deposits because spoil is unstable on steep dips. Example machine reach and bucket combinations cited by Penn State: 200 ft reach with a 200 yd3 bucket, or 300 ft reach with a 120 yd3 bucket, at a typical cycle time of 45 seconds. Where cast blasting is used ahead of the dragline, up to 40 percent of the overburden is actually thrown or cast into the adjacent strip, and a single cast shot may use a million pounds of ANFO or more.
Where it falls downBounded by dragline reach and spoil-room geometry rather than by grade: once overburden thickness exceeds what the machine can cast and rehandle, the method gives way to truck-and-shovel prestripping or terrace mining. Steeply dipping seams are excluded by spoil instability. Under 30 CFR 816.67 - the SMCRA surface coal mining rule, which does reach this method because it is overwhelmingly coal - flyrock must stay within the area of control and the permit boundary and must not be cast more than half the distance to the nearest dwelling or other occupied structure, which constrains cast-blast energy near boundaries.
sourceContour, terrace and highwall/auger mining
Contour mining removes coal in a narrow strip around a hillside in mountainous terrain, working outcrop-inward until the highwall becomes uneconomic. Terrace mining is a variant that also dumps waste in-pit but mines along strike, keying the waste dump into a highwall and linking multiple mining terraces to waste benches by several haul roads, which cuts the vertical component of the waste haul. Mountaintop removal takes the whole seam through the upper part of a ridge and leaves no highwall. Auger and highwall mining are secondary recovery methods that reach under the final highwall after the economic stripping limit is reached, so their selectivity is nil: the machine takes what is in front of it and leaves web pillars behind.
Specification, and where it falls down
SpecificationWhere overburden across a hill is less than 165 feet, outcrop-to-outcrop mining becomes possible. Auger mining recovers around one-third of the coal under the highwall, with maximum recovery less than 35 percent; cutting heads reach as large as 7 feet in diameter and holes may be drilled more than 300 feet deep. A highwall miner can advance 1,200 ft under the highwall versus a typical 300 ft for an auger, giving recovery near 50 percent for the highwall miner against roughly 30 percent for the auger. Terrace mining dimensions are not published as a numeric standard in the source consulted.
Where it falls downAuger and highwall recovery is capped by the web pillars that must be left for stability, which is why recovery is a third to a half rather than the 60 percent-plus of a room-and-pillar panel. Contour mining stops where the highwall height makes further cut uneconomic or unstable. The mountaintop removal variance under SMCRA section 515(c) and 30 CFR 785.14 requires that no highwall remain, which controls where the method can be permitted.
sourceQuarrying (dimension stone)
For sound, unfractured rock that is sold as blocks rather than crushed: granite, marble, limestone, sandstone. Unlike aggregate quarrying, the product is the intact block, so the rock must not be shattered. Extraction is by diamond wire sawing, channelling, burner or line drilling rather than production blasting, and where blasting is used at all it is low-energy splitting. Selectivity is at the individual block: the quarry follows sound stone and leaves fractured or discoloured zones, so dilution in the milling sense does not apply but block yield does.
Specification, and where it falls down
SpecificationVertical quarry walls of 1,000 ft or more can be excavated in dimension stone operations. Bench heights, block dimensions and saleable-block recovery percentages were not given numerically in the sources opened.
Where it falls downStops working where the rock is jointed, weathered or stained beyond the tolerance of the finished-stone market; fracture spacing rather than grade sets the limit. Saw-based extraction rates are an order of magnitude below drill-and-blast, so the method only pays where the block price is high.
sourcePlacer mining and dredging
For loosely consolidated, water-laid deposits where the valuable mineral is free heavy grains: gold, tin, sand and gravel, heavy minerals. Hydraulic mining breaks the bank with a high-pressure water cannon; bucket-line and dragline dredging recover material underwater from a floating plant with an on-board washing and gravity circuit. Selectivity is effectively zero on a per-bucket basis, because the whole gravel column from surface to bedrock is dug and washed; grade control is exercised by choosing which ground to dredge and how deeply to clean bedrock, and ore loss is dominated by gold left in bedrock crevices and by fines lost in the plant.
Specification, and where it falls down
SpecificationPlacer dredges have ranged from 1-1/2 to 20 cubic feet of bucket capacity. Bucket size sets digging depth, but the bucket-to-depth pairs previously given here did not match IC 8462's table and have been withdrawn pending a direct read of the original. What the circular does state: the maximum digging depth recorded to date was 162 feet, and 18-cubic-foot dredges in Malaysia dug 130 to 158 feet below water level. Monthly production for a 3-cubic-foot dredge is given as 60,000 cubic yards at slow speed. Target running time is about 21.5 digging hours per day, roughly 90 percent of available time, with actual performance from 75 percent or less in difficult digging to about 93 percent in very favourable ground. A 9 cubic foot class dredge uses about 75 gallons of water per minute and an 18 cubic foot class about 150 gpm. Dredging is most applicable on surface grades up to 2 percent, with isolated cases up to 6 percent. Dragline placer methods are limited to about 60 feet maximum efficient depth.
Where it falls downFails on cemented or boulder-rich gravels, on steep surface grades, where bedrock is too deep for the bucket line, and where water is unavailable. Recovery losses are inherent: gold left in depressions and crevices in bedrock, gold lost to a poor mining pattern, and gold lost in the plant when not washed free of oversize or when it adheres to clay. The source illustrates how dilute the feed is: gravel averaging 25 cents of gold per cubic yard at a 35 dollar gold price contains by weight about 1 part gold in 6.5 million parts waste.
sourceIn-situ recovery (solution mining / ISL)
For deep, permeable, low-grade deposits that conventional mining cannot reach economically, principally roll-front sandstone uranium. A lixiviant is injected through wells into the ore body to dissolve the uranium, collected in recovery wells and pumped to a processing plant where uranium is stripped by ion exchange, then purified, concentrated and dried to yellowcake. There is no ore and no waste rock in the physical sense, so dilution and ore loss are replaced by sweep efficiency and recovery of uranium in place: the limit on grade reaching the plant is how completely the lixiviant contacts the roll front.
Specification, and where it falls down
SpecificationFive-spot and seven-spot well patterns are common, with wells typically 12 to 50 m (40 to 150 ft) apart. Ore zones lie about 100 to 300 m (328 to 984 ft) deep in many districts, and greater than 560 m (1,840 ft) at one New Mexico deposit. New Mexico deposits run about 0.2 to 0.3 percent U3O8 by weight and Wyoming deposits about 0.1 to 0.25 percent. Alkaline lixiviant chemistry typically runs sodium from under 400 up to 6,000 mg/L, bicarbonate from under 400 to 5,000 mg/L and pH from 6.5 up to 10.5; NRC lists the leach solution as water mixed with oxygen and/or hydrogen peroxide plus sodium carbonate or carbon dioxide. Licensed circulation flow rates typically range from about 15,100 to 34,000 L/min (4,000 to 9,000 gal/min), with a production bleed of about 1 to 3 percent of the circulation rate to hold the wellfield under inward hydraulic gradient. Greater than 95 percent of the uranium in solution is extracted during the ion-exchange step. About 14 ISR facilities exist in the United States (NRC, In Situ Recovery Facilities, page last updated 14 September 2026, https://www.nrc.gov/materials/uranium-recovery/extraction-methods/isl-recovery-facilities.html; this count is not in the GEIS chapter cited below).
Where it falls downRequires permeable sandstone host beds confined above and below by low- or semi-permeable claystones, siltstones, mudstones or shales; without those confining units the lixiviant cannot be controlled. Roll fronts are crescent-shaped, may extend hundreds of metres but may be only a few metres thick, so a thin or discontinuous front gives poor sweep. Groundwater restoration to the standard in 10 CFR 40 Appendix A, Criterion 5(B)(5) is a condition of the method, not an afterthought.
sourceRoom and pillar
The dominant underground method in the United States, used on horizontal or nearly horizontal bedded deposits in reasonably competent ore and host rock: coal, lead, limestone, salt, trona, potash. Rooms are driven on a grid and pillars of ore are left to hold the back. Selectivity is high in plan but poor in section: the operator takes the full mining height across the room, so where roof or floor rock has to be taken to keep the opening stable the operation deliberately accepts dilution to avoid ground control problems. Ore loss is structural and large, since the pillars are ore left underground.
Specification, and where it falls down
SpecificationExtraction ratios are usually more than 60 percent; NIOSH case histories of collapses record extraction ratios of about 70 to 78 percent in the failed areas. Pillar width-to-height ratio is the key design number: failures occurred at ratios always less than 3 in coal, usually much less than 1 in metal mines and less than about 2 in nonmetal mines, while the prevention approach uses panel pillars with high width-to-height ratios greater than about 3 or 4 and barrier pillars typically greater than about 10. Under 30 CFR 75.220 each coal operator must develop and follow a District Manager-approved roof control plan.
Where it falls downStops where pillar stress exceeds pillar strength: collapses are more prevalent in shallow mines less than 100 m deep where slender pillars were left, and the containment approach deliberately uses low width-to-height panel pillars (0.5 to 2 range) with barrier pillars around them so a collapse cannot run. Minimum panel widths for the containment-by-barrier approach are at least 80 m, with at least five and usually more than 10 pillars across the panel width. Significant dip, very weak roof, or ore too valuable to leave in pillars all push the operator to another method.
sourceLongwall
For horizontal tabular deposits of large lateral extent, principally coal and trona. A full panel face is cut in one pass by a shearer or plough under hydraulic powered supports, and the roof is allowed to cave behind the supports as the face retreats. Selectivity is the lowest of any underground method: the machine cuts a fixed web to a fixed height across the whole face, so anything within the cutting horizon reports to the belt. Dilution is set by how much roof and floor rock the cutting horizon takes, and ore loss is confined to the chain pillars and barrier pillars left between panels.
Specification, and where it falls down
SpecificationPanels are typically three to four kilometres long and 250 to 400 metres wide; one worked teaching example is 300 m wide by 2 km long by 3.5 m tall. A plough is preferred for seam heights up to 1.8 m and a shearer for seams from 2.3 to over 6 m. A shearer operating at 16 metres per minute yields a capacity of 5,000 tons per hour. Hydraulic roof supports carry bearing forces up to 1,750 tons. A three-entry gate road system is common US practice, but it is practice and not law: no MSHA standard requires three gate roads or three gate road entries, and two-entry systems operate under approved roof control and ventilation plans. What federal law does require is two separate escapeways from each working section (30 CFR 75.380). Caving may be delayed 10 to 20 or more passes of the shearer at the start of a panel.
Where it falls downNeeds continuity: faults, washouts, thickness changes and igneous intrusions that a room-and-pillar section can mine around will stop a longwall face. Requires that surface subsidence be acceptable, since the roof is deliberately caved. Requires long lead-time gate road development, so the method is committed years before the panel produces.
sourceCut and fill stoping
For steeply dipping, sometimes irregular orebodies in rock too weak to stand open, where the ore is valuable enough to pay for the cycle. The stope is taken in horizontal slices and each slice is backfilled immediately, so the fill becomes both the working floor and the wall support. This is the high-selectivity, low-dilution end of underground mining: the miner sees the ore contact on every slice and can leave waste in place or take it separately, which is why the method is chosen for gold and silver despite low productivity.
Specification, and where it falls down
SpecificationCut or slice height is typically at least 10 ft but no more than 30 ft, set by ground control. Stope height is typically 150 to 300 ft, stope length on the order of 200 to 2,000 ft, and stope width at least 6 ft and up to 100 ft. Three backfill types are used: hydraulic fill of tailings at 55 to 70 percent solids with 3 to 4 percent cement and a 10 percent cement mix to top off; paste fill of unclassified tailings up to 88 percent solids with only a few percent cement; and cemented rock fill of waste rock with cement added. Backfill can represent 10 to 20 percent of the mining cost, of which nearly 75 percent is the cost of the cement.
Where it falls downLow productivity and high cost per tonne confine it to high-value metalliferous ores; the fill cycle interrupts production in every stope. It is also the method of choice for recovering pillars left by other methods. Where the ore is weak as well as the walls, the cut has to shrink toward drift-and-fill dimensions.
sourceDrift and fill
The narrowest form of cut and fill: rather than taking a full slice across the stope, the ore is taken as a sequence of small drift-sized headings, each backfilled before the next is driven beside or above it. Used in weak ore zones where an open slice would not stand for a shift. Selectivity is the highest available underground, because each drift can be steered along the ore contact, and dilution is limited to the overbreak of a single heading plus any fill that sloughs into the adjacent cut.
Specification, and where it falls down
SpecificationDescribed by Penn State as small slice progression in weak ore zones within the cut-and-fill family, so the slice geometry and fill specifications of cut and fill apply: cuts of at least 10 ft and no more than 30 ft, and hydraulic, paste or cemented rock fill with the cement contents listed under cut and fill. No separate published drift dimension range was found in the sources opened; typical practice, not a published standard, is that the drift is sized to the jumbo and loader.
Where it falls downThe lowest-productivity method in the underground set, because every tonne is mined through a development-sized opening and every opening has to be filled. Only viable where the metal value per tonne is very high or where the alternative is sterilising the block.
sourceShrinkage stoping
For steeply dipping veins in reasonably competent ore and host rock. The ore is blasted from below and only about the swell volume is drawn off, so the broken ore left in the stope forms the working platform and helps support the walls; the stope is emptied only when it is mined out. Selectivity is high at the face, because the miner is standing on the muck pile at the vein and can follow it, but the method cannot blend: the source states it does not lend itself well to blending, so the orebody must be uniform in quality.
Specification, and where it falls down
SpecificationApplies to narrow veins as thin as 3 ft or thicker veins of 100 ft or so. Stope length typically 150 to 300 ft and stope height 200 to 300 ft. Ore swell on blasting may be as much as 30 percent or even more, and that swell fraction is what is drawn during mining. Ore may remain in the stope for six months to a year before final drawdown.
Where it falls downTies up working capital because the broken ore sits in the stope for months; requires ore that will not oxidise, pack or cement while it sits. Requires walls competent enough to stand with only broken-muck support. Not suitable where the mine needs to blend grades continuously.
sourceSublevel stoping / open stoping (including big-hole stoping)
A productive, large-scale method for large, steeply dipping orebodies with regular shape and defined boundaries in competent rock. Sublevels are driven through the orebody and long blastholes are drilled between them; ore is blasted into the open void and drawn immediately, unlike shrinkage. Often run as primary and secondary stopes with backfill. Selectivity is limited to the stope outline as designed, which is why the method needs sharp, regular ore boundaries; dilution is low when the walls hold, and is dominated by hangingwall overbreak when they do not.
Specification, and where it falls down
SpecificationBig-hole stoping drills on the order of 300 ft in length at approximately 6 inches in diameter. A slice of approximately 10 to 15 ft is blasted with each round. Sublevel spacing for ring drilling is limited by the accuracy of the ring drills. Penn State describes the method as productive and large-scale with low dilution. Crown and sill pillars are left unmined and hold significant ore of considerable value that cannot be economically extracted without collapse risk.
Where it falls downRequires host rock reasonably strong enough to prevent cave-in, because vast open spaces are created and stand unsupported. Irregular ore boundaries defeat it, since the drill pattern is committed before the ore is seen. Ore tied up in crown and sill pillars is a permanent loss unless a later backfilled pillar-recovery campaign is run.
sourceVertical crater retreat (VCR)
A variant of shrinkage stoping in which large-diameter vertical holes are drilled the full height of the stope from an overcut and charged with short spherical charges that crater a horizontal slice off the bottom of the ore mass on each round, the stope retreating upward. Suits steeply dipping, competent, reasonably uniform orebodies where the ore will stand while it is drawn. Selectivity matches shrinkage: the stope outline is fixed by the drill pattern, so the ore must be uniform enough that a fixed outline does not sterilise value or take waste.
Specification, and where it falls down
SpecificationDrilled on a grid on the order of 12 ft by 12 ft with holes on the order of 6 inches in diameter, designed to take off a 10 ft slice of ore per round.
Where it falls downSame constraints as shrinkage stoping: the ore remains in the stope for months so its mineral properties must be stable, and the method demands high grade and a valuable commodity that is uniform in quality. Not a blending method. Large-diameter hole deviation over the full stope height limits how tall a stope can be drilled accurately.
sourceSublevel caving
For strong, massive orebodies where the hangingwall is very weak and caves quickly. Mining starts at the top and works downward; production drifts are driven on closely spaced sublevels, fans are drilled upward and blasted against caved waste, and ore is drawn from the brow until the waste front arrives. Infrastructure is placed on the footwall side and the method supports a high degree of automation. It is the classic dilution-for-productivity trade: there is always some degree of ore loss and waste rock dilution because ore is drawn through caved waste, and the draw control rule decides how much of each.
Specification, and where it falls down
SpecificationFrom a global review of 24 sublevel caving operations (21 active plus 3 ceased): most modern operations achieve between 80 and 90 percent ore recovery at draw percentages of 100 to 120 percent, with ore loss typically 10 to 20 percent of the orebody. Measured dilution across the benchmarked mines ranged as low as 4 percent and as high as 43 percent. Sublevel spacing across the surveyed operations ranges from about 15 to 30 m centre to centre. Width of draw generally varies between 9 and 12 m with an average of about 11 m; crosscut spacing ranged 12 to 24.75 m centre to centre. Drive widths across the benchmarked operations ran 4 to 7.5 m. Fan-pattern mines drill and charge to about 35 to 40 m; silo designs use blastholes up to 60 m. Peak production rates ranged from 0.2 Mt/a at the smallest to 27 Mt/a at the largest, with most operations between 1 and 6 Mt/a.
Where it falls downThe whole hangingwall must be allowed to cave and the surface must be allowed to subside. Development intensity is high because every sublevel needs a full drift network, which makes development metres per tonne much worse than block caving. Dilution rises steeply if draw is continued past the arrival of the waste front, which is why draw control is the method's governing discipline rather than an administrative task.
sourceBlock caving
The lowest-cost, highest-volume underground method, for large massive low-grade orebodies where the ore will cave under its own weight into manageable pieces. An undercut is blasted beneath the block and the remaining orebody collapses onto an extraction level of drawpoints; caving often propagates to surface. Explicitly not a selective method and unsuitable for following a mineralised zone, so grade reaching the mill is controlled by draw scheduling across hundreds of drawpoints rather than by any face decision. Variants are distinguished by cave volume as much as by ore competence: blocks take the largest cave volumes, panels intermediate volumes, and masses smaller volumes.
Specification, and where it falls down
SpecificationOre blocks can be up to 500 metres in height and several hundred metres in length. Undercut drilling uses holes of 2 to 3 inches. Development can take up to several years of advance work before the first tonne is drawn. Penn State characterises it as a high-productivity method with low operating costs and a long development time before production. Drawpoint spacing, dilution and recovery percentages were not given numerically in the sources opened.
Where it falls downThe orebody must cave under its own weight; if the ore is too competent the cave hangs up and the block is lost. Must be massive both horizontally and vertically. Subsidence of the ground surface above the orebody has to be acceptable, with the subsidence zone deepening and widening as extraction continues. The multi-year development lead means the method commits capital long before it produces, and a mis-set drawpoint layout cannot be changed once the cave is running.
sourceThe protocols that decide whether a result is trustworthy
The procedures between a sample and a number you can rely on
Survey pickup and volume reconciliation (F1/F2/F3 framework)
Monthly and annual reconciliation of what the resource model promised against what the mine delivered and what the mill received. Survey pickup of the mined void or the dig lines produces the volume, which is converted to tonnes by density and compared with the short-range (ore control) model and then with the mill's own measurement. The three standard factors isolate where the discrepancy arises: model error, mine execution error, or measurement error at the plant.
What the procedure actually requires
F1 relates short-term (ore control) model tonnages, grades and metal content to ore reserves depleted, i.e. F1 = short range model depletions / long range model depletions. F2 relates tonnages, grades and metal content received at the mill and measured by the mill to those delivered to the mill and measured by the mine, i.e. F2 = received at mill / delivered to mill. F3 = F1 multiplied by F2 (Parker 2012 states the F3 factor is F1 x F2; it is not F1 divided by F2), and measures the mine's ability to recover the tonnage, grade and metal content estimated in ore reserves. Target tolerance: a good annual reconciliation between mine and mill is plus or minus 5 percent for a base metals mine and plus or minus 10 percent for a precious metals mine. Reconciliation should be an implicit part of the mining process and a key performance indicator, not a month-end report.
sourceGrade control (short-range / ore control modelling)
The short-range model built from blasthole or production-drill samples that decides, shift by shift, which material is ore and which is waste, and to which stockpile or destination each dig block goes. It is a separate model from the resource model and is built at a much finer support; the ratio between the two is what F1 measures.
What the procedure actually requires
F1 is defined as the short range (ore control) model depletion divided by the long range model depletion, and is the formal test of whether grade control is adding or destroying value against the resource estimate. Acceptance bands are the same as the reconciliation targets: plus or minus 5 percent annually for base metals and plus or minus 10 percent for precious metals. Typical practice, not a published standard: open pit grade control samples the blasthole cuttings on the production pattern and marks dig lines for the loader; underground it is face mapping and channel or chip sampling ahead of each cut.
sourceDilution and ore loss measurement
Separating dilution into the part that was designed in and the part that was not, then measuring the unplanned part against the stope design. Planned dilution is predictable because it comes from mining development, geologic contacts or resource estimation. Unplanned dilution is associated with overbreak and wall sloughing from poor blasting, weak rock or inadequate stope design. Dilution is the proportion of waste rock that has to be mucked with ore during the mining process; ore loss is the complement, ore left behind in pillars, brows or fill.
What the procedure actually requires
The standard measurement is a cavity monitoring survey (CMS) of the mined void, compared against the design solid. The derived metric is ELOS, equivalent linear overbreak/slough, due to Clark and Pakalnis (1997): the overbreak volume from the stope hangingwall side divided by the area of hangingwall, giving an average depth of failure over the hangingwall surface in metres. Stability is assessed against hydraulic radius, area in m2 divided by perimeter in m, on the stability graph method of Mathews et al. (1981) as modified by Potvin (1988). Neither concept originates with the journal article formerly cited here. For caving methods, the equivalent measurement is draw control: 80 to 90 percent ore recovery at 100 to 120 percent draw, with measured dilution across a 24-operation benchmark ranging 4 to 43 percent.
sourceEquipment availability and utilisation
The two separate numbers a contract mining agreement is normally paid and penalised against. Availability measures whether the machine was fit to work; utilisation measures whether it was actually working when it was fit. Confusing the two hides whether the loss sits with maintenance or with operations. The reported values below are surface drill rig figures from a two-mine case study, not general contract-mining fleet benchmarks; they should not be applied to trucks, shovels or loaders.
What the procedure actually requires
Technical availability At = (Ht - Hm) / Ht x 100, where Ht is total performance hours and Hm is maintenance hours (preventive plus predictive plus reconditioning); reported values 83.2 to 91.8 percent. Mechanical availability Am = (Ht - Hb) / Ht x 100, where Hb is breakdown hours; reported values 94.4 to 99.5 percent. Utilisation U = (Ha - Hl) / Ha x 100, where Ha is available hours and Hl is loss hours (moving plus idle plus other); reported values 88.5 to 94.1 percent at one mine and 53 to 77.6 percent at another. Overall mining equipment effectiveness OMEE = At x Am x U x P, where P is a productivity index; reported 0.75 at one mine and 0.38 to 0.57 at the other. The source is a case study of surface drilling rigs at two mines (Gutierrez-Diez et al., Applied Sciences 14(5):2185, 2024), so these bands describe drill rigs at those two sites and nothing wider.
sourceGround support standards
The enforceable ground control regime. In metal and nonmetal mines it runs on examination, scaling and certified rock fixtures; in underground coal it runs on a District Manager-approved roof control plan with prescribed bolt geometry and distances from the face.
What the procedure actually requires
Metal/nonmetal (30 CFR Part 57 Subpart B): hazardous ground must be taken down or supported before other work, and unattended hazardous areas posted and barricaded (57.3200); scaling from a protected position with a scaling bar of suitable length and design (57.3201, 57.3202); rock bolts must carry manufacturer certification to ASTM F432-95, tensioned bolts installed to at least 50 percent of yield point or anchorage capacity whichever is less, and, where grouted fixtures can be tested by applying torque, the first fixture installed in each work place tested to withstand 150 foot-pounds of torque, with a second fixture tested in the same manner if the first rotates in the hole (57.3203(g)); ground examined before work, after blasting and during the shift, with haulageways and travelways examined weekly or more often if changing ground warrants (57.3401); a rock burst control plan within 90 days where rock bursts occur (57.3461). Underground coal (30 CFR Part 75 Subpart C): an approved roof control plan is mandatory (75.220); bearing plates used directly against the mine roof at least 6 inches square or the equivalent, 5 inches square or the equivalent where the roof is firm and not susceptible to sloughing, and at least 4 inches square or the equivalent where used with wood or metal header material (75.204); tensioned bolts at least 30 inches long for beam building; two separate measurement duties under 75.204 - for newly installed tensioned bolts, the first bolt installed with each drill head measured immediately in each roof bolting cycle and thereafter at least one bolt in every four per drill head, with corrective action if the torque falls outside the installation torque range; and, separately, at least one in every ten previously installed mechanically anchored tensioned bolts measured from the outby corner of the last open crosscut to the face, with corrective action where they do not maintain at least 70 percent of the minimum torque or tension specified in the roof control plan; bolts on centres not exceeding 5 feet lengthwise and crosswise, and not exceeding 10 feet crosswise with integral roof bolters - but note these figures come from 75.222, Roof control plan-approval criteria, which is advisory, not mandatory: a plan that does not conform to those criteria may still be approved by the District Manager provided effective control of the roof, face and ribs can be maintained; support installed to within 5 feet of the uncut face and temporary supports on no more than 5-foot centres (75.206, 75.210); maximum opening width 20 feet with conventional support, 16 feet with full overhead support and 14 feet where only posts are used (75.206); visual examination of roof, face and ribs immediately before any work starts (75.211).
sourceVentilation requirements
Underground air quality and the written ventilation plan that delivers it. The plan is the document an operator is audited against; the air quality standards are the numbers the plan has to achieve at the working place.
What the procedure actually requires
30 CFR 57.8520 requires the ventilation system to be documented in writing and updated annually, including fan specifications, airflow directions and equipment locations. 57.8525 requires main fans maintained to manufacturer recommendation or a written operator schedule. 57.8527 requires flame safety lamps or other suitable devices to test for acute oxygen deficiency. 57.8528 requires unventilated areas to be sealed or barricaded and posted. 57.8529 requires auxiliary fan systems to minimise recirculation and effectively sweep the working place; 57.8534 requires air quality testing after an auxiliary fan failure. Air quality numbers sit in Subpart D: at least 19.5 volume percent oxygen in all active workings (57.5015); asbestos full-shift limit 0.1 fiber/cc with a 1 f/cc excursion limit over 30 minutes (57.5001); radon daughters not to exceed 4 WLM annually (57.5038) and 1.0 WL in active workings (57.5039); underground diesel particulate limit 160 micrograms total carbon per cubic metre (57.5060).
sourceHighwall, bench and slope stability management (surface)
The surface equivalent of a ground support standard: geometry that keeps people out from under material that can move, plus the physical berms and setbacks that catch what does.
What the procedure actually requires
30 CFR 56.3130 requires mining methods that maintain wall, bank and slope stability where persons work or travel, and where benching is necessary the width and height shall be based on the type of equipment used for cleaning of benches or for scaling of walls, banks and slopes: the regulation sets no fixed bench dimension. 30 CFR 56.3131 requires loose or unconsolidated material to be sloped to the angle of repose OR stripped back for at least 10 feet from the top of the pit or quarry wall; the two are alternatives, not a single stripping requirement. 30 CFR 56.9300 requires berms or guardrails at least mid-axle height of the largest self-propelled mobile equipment which usually travels the roadway, on banks of roadways where a drop-off exists of sufficient grade or depth to cause a vehicle to overturn or endanger persons in equipment. The phrase over-travel berm is not regulatory text, and 56.9300 addresses roadways, not benches generally. Catch bench width should be based on the geology, the highwall height and 30 CFR 56.3130; no numeric ratio is set by the regulation.
sourceSpecifications worth knowing
Technical figures, each linked to the document it came from
- 20 to 50 feetTypical open pit bench height taught as the working range; bench height is matched to the loading unit and drill rather than fixed by regulation.source
- Up to 15 percentMaximum gradient used for open pit haul roads (ramps).source
- More than 60 percent, with failures recorded at about 70 to 78 percentRoom-and-pillar extraction ratio: usual design level, and the ratios measured in the failed areas of NIOSH-documented coal, metal and nonmetal pillar collapses.source
- 80 to 90 percent recovery at 100 to 120 percent draw, dilution 4 to 43 percentBenchmarked sublevel caving performance across 24 operations (21 active plus 3 ceased), with ore loss typically 10 to 20 percent of the orebody.source
- 250 to 400 m wide by 3 to 4 km longTypical longwall panel dimensions; a shearer at 16 m/min gives a face capacity of 5,000 tons per hour and supports carry up to 1,750 tons.source
- Plus or minus 5 percent (base metals) and plus or minus 10 percent (precious metals)What counts as a good annual mine-to-mill reconciliation under the F1/F2/F3 framework.source
- 40 to 90 m wide strips, maximum 50 to 80 m of overburdenaustralian dragline strip mining geometry and the overburden depth beyond which a dragline can no longer strip the deposit. From Mitra and Saydam, Surface Coal Mining Methods in Australia (IntechOpen, 2012); this is Australian practice, not a US standard.source
- Roughly 30 percent (auger) versus near 50 percent (highwall miner)Coal recovery from under a final highwall by secondary methods; the auger reaches about 300 ft and the highwall miner about 1,200 ft.source
How it is actually bought
Contract shapes and what they price
The dominant shape is a schedule of rates: a price per bank cubic metre or per tonne, broken out by material type, dig difficulty, haul distance and lift, with separate rates for drill metres, development metres, shaft metres, road construction and rehandle, and monthly payment claims settled against survey-measured volumes. Early works and ground with genuine uncertainty are often bought cost-plus or on a management fee, converting to rates once conditions are known; well-defined earthworks packages go lump sum; long-life operations sometimes use alliance or incentive structures with a shared pain-and-gain pool. The clauses that decide whether the rate holds are rise and fall or fuel escalation, standby and wet-weather rates, minimum volume or take-or-pay commitments, separately priced mobilisation and demobilisation, availability and utilisation regimes, and the survey method and reconciliation rules. Risk allocation is conventionally that the owner carries ground conditions, grade and geology and the contractor carries productivity, equipment availability and labour; and disputes commonly turn on a rate schedule whose material classes do not match what the pit actually contains. On federal contracts and federally assisted work Davis-Bacon prevailing wages, weekly certified payrolls and posted wage determinations apply on top of everything else.
Who regulates it
And what each one requires of this trade
- MSHA — 30 CFR Part 45, independent contractors — Exists to hold independent contractors responsible for violations committed by them and their employees: the contractor may obtain a permanent MSHA identification number from the district manager and must give the production-operator its trade name, business address, telephone number, description and location of work, MSHA ID and address of record for service of citations, which the mine must keep on site and produce on request.
- MSHA — 30 CFR Part 48 (and Part 46) training — Requires at least 40 hours of training for new underground miners, at least 24 hours for new surface miners under Part 48, 8 hours of annual refresher for all miners, task training on new equipment or duty assignments, and an MSHA-approved training plan that the district manager acts on within 60 days and that must be posted at the minesite.
- MSHA — Safety Program for Surface Mobile Equipment — From 17 July 2024 every operator, of any size, must have a written programme for surface mobile equipment covering hazard identification and risk reduction, routine maintenance and non-routine repair procedures and schedules, evaluation of available and emerging safety technologies, and training, developed in consultation with miners and their representatives — which a contract miner bringing its own fleet must be able to produce and align with the mine's.
- U.S. Department of Labor, Wage and Hour Division — Davis-Bacon and Related Acts — On federal or District of Columbia construction contracts over $2,000, and on federally assisted work under the related Acts, contractors and subcontractors must pay locally prevailing wages including fringe benefits, pay covered workers weekly, submit weekly certified payrolls to the contracting agency, and post the applicable wage determination and the WH-1321 poster on site; non-compliance can mean withheld payment, termination, liability for extra costs and debarment.
- Bureau of Land Management — 43 CFR Subpart 3809 — The contractor works inside the owner's authorisation: operations greater than casual use need an approved plan of operations, exploration disturbing 5 acres or less needs a notice, bulk sampling of 1,000 tons or more of presumed ore needs a plan, and BLM requires a surface management bond on all 3809 notices and plans, so a contractor who strays outside the approved footprint puts the owner's bond and permit at risk.
The standards that apply
Ask which of these a firm works to
- 30 CFR Part 45 — independent contractor register and identification — Sets what the contractor must supply and what the production-operator must record and keep available to MSHA, and makes the contractor's address of record its official address for service of citations and orders.
- 30 CFR 56 Subpart T / 57 Subpart U / 77 Subpart V — The surface mobile equipment safety programme sections added by MSHA's 2023 final rule (56.23000–56.23004, 57.23000–57.23004, 77.2100–77.2104), effective 19 January 2024 with compliance from 17 July 2024.
- 30 CFR 46.5 and 30 CFR Part 48 — training hours — Part 46 sites (sand, gravel, surface stone, surface clay and limestone, colloidal phosphate, shell dredging and similar) require 24 hours of new miner training with 4 hours before work begins and the balance within 90 days; Part 48 sites — all underground mines and other surface mines — require 40 hours underground or 24 hours surface, with 8 hours annual refresher in both cases.
- 30 CFR Part 56 — safety and health standards, surface metal and nonmetal mines — Twenty subparts including ground control, explosives, drilling, loading, hauling and dumping, travelways, electricity, machinery and equipment, illumination and safety programmes; these are the standards a contract mining crew's practices will be inspected against, whoever employs them.
- 43 CFR 3809.21 — notice threshold for surface disturbance — A complete notice must be filed 15 calendar days before exploration causing surface disturbance of 5 acres or less of unreclaimed public land, which sets the point at which a road-building or trenching scope tips a project into full plan-of-operations territory.
What to demand from a firm
Credentials worth checking before you sign
- MSHA contractor identification number and compliance history — Demand the contractor's Part 45 MSHA ID and address of record before award, then look up its citation, order and injury record rather than accepting a safety statistics slide; Part 45 exists precisely so that the contractor, not just the mine, is answerable.
- Current Part 46 or Part 48 training records for every person mobilising — Including the MSHA-approved training plan where Part 48 applies, since the plan must be approved by the district manager and posted at the minesite, and short-term specialist crews such as drillers and blasters have their own hazard-training pathway.
- State contractor licensure where the scope is licensed construction — Road building, bulk earthworks and civil packages are licensed construction in most states, with licensing thresholds, examination, financial responsibility and reciprocity rules that differ by jurisdiction across all 50 states, DC and the territories — check the licence in the state of the work, not the contractor's home state.
- The contractor's own written surface mobile equipment safety programme — Ask to see it, not just a promise to comply: the rule requires actions to identify and analyse hazards, procedures and schedules for routine maintenance and non-routine repairs, evaluation of emerging safety technologies, and training, with copies available to workers at no cost.
Where to find firms yourself
Public registers and member directories
- MSHA Mine Data Retrieval System — MSHA's public search over mine and contractor records — the single most useful pre-award check available to a buyer, because a contractor's MSHA ID carries its enforcement and injury history across every site it has worked.
- NASCLA Contractor State Licensing Information Directory (CSLID) — Published by the National Association of State Contractors Licensing Agencies, covering licensing thresholds, fees, regulators and reciprocity rules for all 50 states, DC, Guam and the US Virgin Islands, with side-by-side jurisdiction comparison; it is a paid subscription, and it points to each state's own licensing agency, which is where verification happens free.
- SAM.gov entity information and exclusions — Free public search of federal entity registrations, exclusion (debarment) records and responsibility and qualification data — the check that catches a contractor debarred from federal work before you put it on a federally assisted job.
- SAM.gov Davis-Bacon wage determinations — Wage determinations are published and must be posted on site; a buyer pricing federally assisted earthworks should pull the applicable determination for the county and construction type themselves rather than accept a contractor's labour rate assumption.
Numbers worth knowing
Each one carries its source
In fiscal year 2025 MSHA recorded 28 mining fatalities — 5 coal and 23 metal/nonmetal — of which 7 were contractors (1 coal, 6 metal/nonmetal). Contractor crews are a disproportionate share of the death toll relative to hours worked, which is the argument for treating a contractor's safety system as a technical evaluation item, not a compliance box.
sourceMSHA fiscal year 2025 totals: 886 coal and 11,682 metal/nonmetal mines, 62,901 coal and 264,564 metal/nonmetal employees, with 87,372 citations and orders issued.
sourceAverage hourly earnings and average weekly hours for all employees in Support Activities for Mining (NAICS 213) in July 2026, with employment of 262.7 thousand in August 2026 (preliminary). Note this BLS sector includes oil and gas well support services as well as mining support, so treat it as a labour-cost benchmark for the contracting sector rather than a count of mining contractors.
sourceThe federal contract value above which Davis-Bacon prevailing wages, weekly pay, weekly certified payroll submission and on-site posting of the wage determination and the WH-1321 poster apply — low enough that almost any federally funded earthworks scope is caught.
sourceOn BLM land, exploration disturbing 5 acres or less proceeds on a 15-day notice, while operations greater than casual use and bulk sampling of 1,000 tons or more of presumed ore need an approved plan of operations — the limits a stripping or trenching contractor can breach in a single shift.
sourceHow this goes wrong
The specific traps, not general advice
- Writing a rate schedule whose material classes do not match the deposit. If the pit contains three dig difficulties and the schedule prices two, every dispute for the next five years is about reclassification, and the contractor holds the survey data.
- Leaving the survey and reconciliation method out of the contract. Payment is per bank cubic metre or per tonne measured somehow; if the pickup method, the density assumption, the void and rehandle treatment and the dispute procedure are not written down, monthly claims become negotiations.
- Buying hours instead of production without realising it. A contract that pays for machine availability and operator hours transfers no productivity risk at all; a contract that pays per tonne does, and the two look similar on a rate sheet.
- Skipping the Part 45 and Part 46/48 paperwork check at mobilisation. The mine keeps the contractor records and takes the enforcement consequences, and an untrained crew on site is a stoppage as well as a citation.
- Ignoring the permit boundary. The contractor works under the owner's plan of operations, notice or SMCRA permit and the owner's bond; an access road pushed 200 metres outside the approved disturbance is the owner's violation, the owner's reclamation cost and potentially the owner's bond forfeiture.
The vocabulary
Defined by someone who is not selling you anything
- Bench
- A horizontal working level in a surface mine, made up of a bench floor (the horizontal surface) and a bench face (the vertical surface). Bench height is the vertical distance between the upper and lower bench surfaces; bench width is the distance from crest to toe measured along the upper surface.
- Crest
- The exterior vertex where the bench floor meets the bench face — the top edge you stand back from.
- Toe
- The interior vertex where the bench face meets the bench floor — the bottom of the face. In blasting the same word means the unbroken rock left at the base of a blasthole when the charge does not reach floor level.
- Berm
- A pile of broken material built along the crest of a bench or haul road to act as a guard rail, stopping vehicles going over the edge and catching falling rock. Under 30 CFR 56.9300, berms or guardrails on roadway banks with a drop-off are at least mid-axle height of the largest self-propelled mobile equipment which usually travels the roadway.
- Catch bench (safety bench)
- A bench left deliberately un-mined to collect material sliding off the benches above and stop large rock pieces or boulders before they reach the working level. Its width is set by the geology, the highwall height and the equipment that must clean it.
- Ramp
- The inclined haul road connecting benches in a pit. Open pit haul roads are built to a gradient of up to about 15 percent, and their width is set by the truck dimensions and the number of traffic lanes.
- Highwall
- The face of exposed overburden and coal in an open cut of a surface coal mining activity, or the face at an entry to underground mining. The SMCRA mountaintop removal variance requires that no highwall remain.
- Stripping ratio
- The quantity of waste that must be moved to expose one unit of ore, expressed as tonnes or cubic yards of waste per tonne of ore.
- Stripping
- Removing the overburden that lies above the deposit. In strip mining the overburden is not hauled to a dump but cast or stripped directly into the adjacent mined-out cut.
- Overburden / spoil
- Overburden is material of any nature, consolidated or unconsolidated, that overlies a coal deposit, excluding topsoil. Spoil is overburden that has been removed during surface mining operations.
- BCM (bank cubic metre)
- A cubic metre of rock measured in place, before it is blasted or dug — the volume as it sits in the bank. Because broken rock swells, a BCM occupies substantially more volume once it is in the truck: shrinkage stoping practice assumes blasting swells ore by as much as 30 percent or more.
- Angle of repose
- The steepest angle at which loose, uncemented material will stand without sliding.
- Dilution
- The proportion of waste rock that has to be mucked with the ore during mining, which lowers the grade reaching the mill. Planned dilution comes from development, geologic contacts or the resource estimate and is predictable; unplanned dilution comes from overbreak and wall sloughing due to poor blasting, weak rock or inadequate stope design.
- Ore loss
- Ore that is in the deposit but never reaches the mill — left in pillars, left at brows, lost to caved waste or left in bedrock crevices. In sublevel caving ore loss is typically 10 to 20 percent of the orebody; in auger mining under a highwall, recovery of only about one-third of the coal means roughly two-thirds is ore loss by design.
- ELOS (equivalent linear overbreak/slough)
- A normalised measure of unplanned dilution, due to Clark and Pakalnis (1997): the overbreak volume from the stope hangingwall divided by the hangingwall area, giving an average depth of failure in metres over that surface. Measured by comparing a cavity monitoring survey of the mined void against the design solid.
- Cut-off grade
- The grade at which a block of mineralised material is classified as ore rather than waste. It is applied in the short-range (ore control) model that draws the dig lines, and the ratio of that model's depletion to the resource model's depletion is the F1 reconciliation factor.
- Stope
- The underground excavation from which ore is produced, as distinct from development openings. Cut-and-fill stopes typically run 150 to 300 ft high, 200 to 2,000 ft long and 6 to 100 ft wide; shrinkage stopes typically 150 to 300 ft long and 200 to 300 ft high.
- Pillar
- Ore or rock left standing to support the back or the overlying strata. Room-and-pillar extraction ratios are usually more than 60 percent, and pillar width-to-height ratio governs stability: failures occurred at ratios under 3 in coal, while the prevention approach uses panel pillars above about 3 to 4 and barrier pillars above about 10.
- Backfill
- Material placed into a mined void to support the walls and provide a working floor. Hydraulic fill is tailings at 55 to 70 percent solids with 3 to 4 percent cement; paste fill is unclassified tailings up to 88 percent solids with a few percent cement; cemented rock fill is waste rock with cement added. Backfill can be 10 to 20 percent of mining cost, of which nearly 75 percent is the cement.
- Development
- The openings driven to reach and service the ore — shafts, ramps, crosscuts, sublevels, drawpoints — as opposed to the stoping that produces ore. Development-intensive methods such as sublevel caving need a full drift network on every sublevel; block caving can take up to several years of advance work before the first tonne is drawn.
- Mucking
- Loading and removing broken rock from the face or drawpoint after blasting. In shrinkage stoping only the swell (about 30 percent) is mucked during mining and the rest is drawn when the stope is finished; in caving, mucking at the drawpoint is the point at which dilution is either controlled or admitted.
- Draw control
- The discipline of regulating how much broken ore is taken from each drawpoint in a caving mine. Modern sublevel caving achieves 80 to 90 percent ore recovery at draw percentages of 100 to 120 percent; drawing past the arrival of the waste front is what pushes measured dilution toward the high end of the 4 to 43 percent benchmark range.
Questions to ask before you sign
- What are your MSHA incident rates for the last three years?
- Is the fleet owned or subcontracted, and what is its average age?
- How is the rate structured — by tonne, by hour, or by metre?
Where to next
Blasting & explosives
Drill-and-blast design, product and licensed crews
PreviousEquipment, parts & rebuild
Machines, spares, component rebuild and hire
Free listingWork in this trade?
List your business here at no cost. Every submission is read by a person before it goes up.
Every figure and requirement on this page is linked to the agency, standard or register it came from. Nothing here is legal advice, rules change, and a link is worth more than our summary of it — follow them.