Services › Category 1 of 18

Drilling & boring

Core, RC, rotary, sonic and geotechnical drilling

Drilling and boring is the business of making a hole in the ground and bringing back either a sample or a usable void, and the method you buy depends entirely on what you need out of it. Core (diamond) drilling cuts a continuous cylinder of intact rock using a diamond-impregnated bit and a wireline inner tube, and is what you buy when you need to see structure, grade continuity and rock quality for a resource estimate; reverse circulation (RC) drilling blows rock chips up the inside of a dual-wall rod string and is cheaper and faster per metre than core, so it is used for grade-control and broad-spaced first-pass testing where intact rock is not needed. Rotary and rotary-air methods make larger, faster holes for water supply, dewatering, ventilation and blastholes; sonic (resonant) drilling uses high-frequency vibration to advance casing and recover near-continuous soil core in unconsolidated ground; geotechnical drilling combines hollow-stem auger, split-barrel sampling and coring to get the soil and rock parameters a foundation, tailings dam or pit-slope design needs. Blasthole drilling is production drilling on a designed pattern to accept explosives, and water-well drilling is a separately licensed trade in most states because it creates a permanent conduit to an aquifer. The same rig rarely does all of these well, so the method decision drives the contractor shortlist, not the other way round.

33 firms working in this trade

Alphabetical. Nobody paid to be here

  • Aggregate Resource IndustriesSpringfield, Oregon

    Rock drilling and blasting for quarries and mine sites

    ariinc.com
  • Alaska Drilling & CompletionsAnchorage, Alaska

    Continuous hard rock coring for mineral and geothermal exploration

    ak-dc.com
  • Alford DrillingElko, Nevada

    Diamond core, reverse circulation and water well drilling, Western US

    alforddrilling.com
  • American Drilling CorpSpokane Valley, Washington

    Surface and underground exploration drilling for mining and geotechnical work

    americandrillingcorp.com
  • American Engineering TestingSt. Paul, Minnesota

    Geotechnical drilling and subsurface investigation with field and laboratory testing

    teamaet.com
  • Boart LongyearSalt Lake City, Utah

    Surface and underground coring, reverse circulation, rotary and sonic drilling

    boartlongyear.com
  • Cascade EnvironmentalBothell, Washington

    Sonic, auger, rotary, direct push and coring drilling methods

    cascade-env.com
  • Earth DrillingFallon, Nevada

    Reverse circulation, wireline coring, sonic and rotary drilling

    earthdrilling.com
  • East Coast DrillingMt. Laurel, New Jersey

    Environmental and geotechnical drilling: auger, mud rotary, direct push

    eastcoastdrill.com
  • Envirotech DrillingWinnemucca, Nevada

    Reverse circulation drilling, monitor wells, drill pads and reclamation

    envirotechdrilling.com
  • Geo-Ex Subsurface ExplorationDixon, California

    Sonic, rock coring, rotary wash and cone penetration testing

    geoexsubsurface.com
  • Godbe DrillingMontrose, Colorado

    Surface and underground core drilling, directional and helicopter-portable rigs

    godbedrilling.com
  • Gregory DrillingNorth Bend, Washington

    Sonic, environmental, geotechnical and mineral exploration drilling

    gregorydrilling.com
  • Hawkston DrillingSpring Hill, Tennessee

    Sonic and rotary drilling, soil sampling and monitoring wells

    hawkston.com
  • HD Sonic DrillingEast Palestine, Ohio

    Air rotary, sonic, exploration and geotechnical drilling services

    hdsonicdrilling.com
  • Holocene DrillingPuyallup, Washington

    Geotechnical drilling, wireline rock coring, sonic and auger methods

    holocenedrilling.com
  • Holt ServicesEdgewood, Washington

    Environmental, geotechnical and clean water drilling, sonic rigs

    holtservicesinc.com
  • KP ExplorationCottonwood, Arizona

    Diamond core and reverse circulation surface drilling for mineral exploration

    kpexploration.com
  • KP Ventures Well Drilling and PumpCamp Verde, Arizona

    Diamond core, reverse circulation and water well drilling for mining

    kpventureswelldrilling.com
  • LJ Hughes and SonsSummersville, West Virginia

    Diamond core drilling for mineral exploration, grouting and soil borings

    ljhughesandsons.com
  • McCallum Rock DrillingChehalis, Washington

    Drilling and blasting for quarries, mines and construction sites

    mccallumrock.com
  • National EWPElko, Nevada

    Surface and underground core, RC and rotary drilling, dewatering

    nationalewp.com
  • New Frontier DrillingFallon, Nevada

    Reverse circulation drilling for mineral exploration and mining

    newfrontierdrilling.com
  • NexTerra SubterraneanNew Cumberland, Pennsylvania

    Rock coring, SPT sampling, augering and mud rotary drilling

    nexterradrilling.com
  • NGE, Inc.Moon Township, Pennsylvania

    Geotechnical and coal reserve exploratory drilling, environmental field services

    ngeconsulting.com
  • Nothnagle DrillingScottsville, New York

    Blast hole, environmental, geotechnical and geothermal drilling services

    nothnagledrilling.com
  • O'Keefe DrillingButte, Montana

    Reverse circulation, rotary and grade control drilling for mines

    okeefedrilling.com
  • Premier DrillingElko, Nevada

    Mineral exploration, mine dewatering and water supply well drilling

    premierdrilling.com
  • Redcor DrillingCarlin, Nevada

    Diamond core drilling for mining operations, development and exploration

    redcordrilling.com
  • Stewart Brothers Drilling CompanyMilan, New Mexico

    Conventional coring, rotary, dewatering and mine service hole drilling

    stewartbrothers.com
  • Testing Service CorporationCarol Stream, Illinois

    Contract drilling, rock coring and geotechnical laboratory testing

    tsccorp.com
  • Timberline DrillingHayden, Idaho

    Underground and surface core drilling for mining and exploration

    timberline-drilling.com
  • Virginia Drilling CompanyVansant, Virginia

    Drilling and blasting for mining, quarry and construction projects

    vadrillco.com

Listed because we found them, not because they asked or paid. Every entry was checked against the company’s own website; none of it is an endorsement, and we have no commercial relationship with anyone on this page. Work in Drilling and boring and want to be added, corrected or removed? Tell us — it is free either way.

The methods, and when each is used

What each technique is for, what defines it, and where it fails

Diamond core drilling (wireline)

Cuts a continuous cylinder of intact rock so that lithology, alteration, veining, structure and contacts can be measured in place rather than inferred from chips. It is the reference method against which every other drilling method's sample is judged, and the only common method that preserves rock fabric and orientation.

Specification, and where it falls down

SpecificationGives an intact core. Standard wireline sizes run AQ, BQ, NQ, HQ, PQ and SQ in ascending diameter. The diameters themselves are set by ASTM D2113 and by drilling-industry convention, and no open-access government or standards-body table of the full series could be opened for this page, so individual core and hole diameters are not asserted here. The one size pair that can be cited is from the ASTM RQD method, which gives NX as 54.7 mm core in a 75.7 mm hole and NQ as 47.5 mm core. 'Wireline' means the inner tube holding the core is winched up through the rod string instead of tripping the whole string — ASTM D6286/D6286M-20, the drilling-method selection guide, notes that 'Wireline rock coring is used in competent rock and results in the best core recovery'. The US federal interagency FRTR reference linked below lists rotary diamond drilling at a maximum depth of '>1000 feet' with a core barrel tube '10 to 26 feet long'. Sampling convention is to saw the core longitudinally, assay one half and retain the other; US National Park Service curation guidance states the retention rule as splitting the core lengthwise 'with at least one half remaining in the box so that a continuous vertical portion of the core remains'.

Where it falls downSlowest and most expensive per metre of the common methods; a federal guide notes the sample 'is available after an extended wait' and that diamond bits cost more than roller bits. Core is lost preferentially in exactly the ground that matters — faults, shears, oxidised and clay-altered zones — and that core loss is not random with respect to grade. Drilling fluid can invade and wash fines from friable core. The West Virginia DEP Geology Handbook, a state surface coal mining regulatory handbook, sets a blunt threshold for coal-quality coring: 'If the recovery is less than 95 percent, the hole should probably be redrilled.' Small-diameter core gives a small sample mass, which matters for coarse-grained or nuggety mineralisation. Monitoring wells completed in diamond-drilled holes 'may be difficult to develop, especially small diameter wells, because of mud or filter cake on wall of the borehole'.

source

Reverse circulation (RC) percussion drilling

The workhorse for bulk grade sampling in mineral exploration and grade control. A dual-wall rod string carries compressed air down the annulus between the outer and inner tubes; cuttings return up the inner tube to a cyclone, so the sample never touches the borehole wall on its way out.

Specification, and where it falls down

SpecificationGives chips, not core — the rock is destroyed but the sample is captured cleanly and continuously, normally over 1 m intervals and split at the rig with a cone or riffle splitter. The defining advantage, stated in an AusIMM conference paper (Stanley, 1986, available only by subscription and therefore not linked here), is that 'cuttings are free of contamination as they are at no time in contact with the outside formation of the hole'. The same paper divides RC into 'R.C. Roller and Blade for softer formations; and R.C. Percussion for harder formations'; the percussion version is driven by a down-the-hole hammer. USGS, writing about reverse-circulation systems used in water-well and test drilling rather than about dual-wall mineral-exploration RC, notes they achieve 'high ascending velocities (can be several hundred feet per minute)' and give 'the best cuttings samples of any drilling method'. note: typical RC hole diameters (commonly around 5 to 5.5 inches) and per-metre sample masses are widely quoted industry practice, but no government, standards-body or academic source giving those numbers could be opened for this page, so they are omitted here rather than reconstructed.

Where it falls downNo intact core: there is no fabric, no vein geometry, no structural orientation and no RQD. Sample degrades badly below the water table, where wet cuttings smear, stick in the cyclone and split unevenly; a wet RC split is a different sample from a dry one. Fine, soft or high-grade material can be lost preferentially to the dust fraction. The USGS TWRI notes that the conventional (non-dual-wall) reverse-circulation configuration used for water wells has a 'practical minimum diameter (about 16 in.)' which 'almost precludes its being used for test-hole drilling'. Contamination still occurs if the hammer is lifted off the bottom or if the hole caves above the bit.

source

Air rotary (open-hole, conventional circulation)

Fast open-hole drilling in consolidated rock using compressed air to lift cuttings up the annulus between the rod string and the borehole wall. Used for water wells, geotechnical and environmental holes in bedrock, and for cheap reconnaissance in mineral exploration.

Specification, and where it falls down

SpecificationGives chips returned up the outside of the rods. A US federal interagency reference gives maximum depth '>1,000 feet', 'limited only by the capacity of the air compressor to deliver enough air', and a minimum 6-inch hole diameter for adequate cuttings circulation. The West Virginia DEP Geology Handbook, a state surface coal mining regulatory handbook rather than a general drilling standard, specifies an air velocity 'of between 3000 and 4000 ft/minute' for effective cuttings lift, cuttings 'normally be of a size. ½ inch or less in diameter', and sampling 'continuous and in 1-foot intervals, unless a lithology change warrants a smaller increment'. USGS records that 'in some instances, the air-rotary coring method cuts faster and provides less-contaminated core' than mud rotary.

Where it falls downdestructive. Because cuttings return up the open annulus they can be contaminated by material sloughing from the walls at any depth above the bit, so a given 'sample' can contain rock from anywhere in the hole. USGS measured that air-rotary coring dried the sample, with 'moisture decreases ranging from 22 to 45 percent' — so the method is poor for moisture-sensitive or volatile work. Requires casing in soft formations below the water table; carries a cross-contamination risk between zones at different water pressures; compressor discharge can introduce hydrocarbon contamination; down-hole hammer drilling 'may cause hydraulic fracturing'.

source

Rotary air blast (RAB)

The cheapest and shallowest reconnaissance drilling in mineral exploration: a blade or hammer bit on a simple rod string, with compressed air blowing cuttings up the outside of the rods to the collar. Used for first-pass geochemical traverses and for drilling through soil and saprolite to bedrock.

Specification, and where it falls down

SpecificationGives chips, destructive, and the sample return path is the open annulus — the same path described for conventional air rotary above, which is the source of its characteristic sample problem. note: RAB is essentially small, cheap open-hole air rotary; specific RAB hole diameters, per-hole depths and costs are widely quoted by drilling contractors but no government, standards-body or academic source giving numeric RAB specifications could be opened for this page, and none is invented here.

Where it falls downThe worst sample quality of any method still in routine use, for a structural reason: cuttings travel up the open hole and are progressively mixed with, and diluted by, material falling in from the walls above. Depth assignment of a RAB interval is therefore approximate and down-hole smearing is expected. Unusable below the water table. No core, no structure, no reliable grade — RAB results are normally treated as anomaly-detection data, not as resource-quality assays.

source

Air core

The middle ground between RAB and RC: a blade or hammer bit with an inner tube, so cuttings return up the centre of the rods rather than the annulus. Used for shallow regolith and soil-profile sampling, geochemical grids, and for drilling to the top of fresh rock.

Specification, and where it falls down

SpecificationGives chips. It is destructive but, like RC, uses an inner-tube return path, which is the whole point of the method. That dual-wall return principle is documented by USGS in the source linked below, which does not itself discuss air core; no government, standards-body or academic description of air core drilling as such could be opened for this page: it buys most of RC's contamination control at close to RAB's cost. Sampling is normally on 1 m intervals at the cyclone. note: typical air core hole diameters and depth limits (commonly quoted as roughly 100 to 150 m in soft ground) come from drilling-contractor literature; no government, standards-body or academic source with those figures could be opened for this page, so the numbers are omitted rather than guessed.

Where it falls downRestricted to soft to moderately competent ground — soil, saprolite, weathered rock and soft sediments. It stalls in fresh, hard or abrasive rock and in coarse gravel and boulders. No intact core and no structural information. Sample quality falls off sharply below the water table, as for all air-return methods. Because rates of penetration are high, depth control depends entirely on disciplined interval-by-interval sample capture at the cyclone.

source

Mud rotary (direct fluid rotary)

Rotates a tri-cone roller bit while pumping drilling fluid — water with bentonite or polymer — down the rods and back up the annulus. The fluid cools the bit, lifts cuttings and builds a filter cake that holds the hole open without casing. The standard method for deep water wells and for geotechnical holes where groundwater is present.

Specification, and where it falls down

SpecificationGives chips recovered from the returning fluid, usually over a shale shaker; core and split-spoon samplers can be run down the rods. A federal interagency reference gives '>1000 feet is the usual limit, but greater depths are possible depending on the borehole diameter, mud pump capacity, and ability to maintain circulation', over a 'wide range of borehole diameters in consolidated and unconsolidated materials'. USGS Techniques of Water-Resources Investigations 2-F1 records a penetration rate in unconsolidated materials of about '1 ft every 5 min'. ASTM D6286/D6286M-20 lists fluid rotary drilling where groundwater is present among the predominant methods for geotechnical soil investigation.

Where it falls downdestructive, and the sample is the worst-resolved of the fluid methods: 'Collection of representative samples is difficult due to mixing of drill cuttings and sample lag time in deeper holes' — the cuttings you catch at the shaker left the bit minutes ago and are mixed with everything else in the return. The mud itself is a contaminant: 'the presence of drilling mud can contaminate the water samples', and residual fluid in the formation 'may lower borehole permeability'. USGS notes drilling fluid invades core and that 'too much fluid can result in abrasive damage'. Unsuitable for fractured, cavernous or very coarse ground where circulation is lost.

source

Sonic (rotosonic) drilling

Advances a casing and core barrel by high-frequency axial vibration, with slow rotation and usually no drilling fluid. It recovers continuous, full-diameter core of unconsolidated material — sands, gravels, tills, fill and mine waste — that no other method recovers intact.

Specification, and where it falls down

SpecificationGives a continuous core of soil and soft rock, though a disturbed one. A US federal interagency source gives a vibration frequency 'generally between 50 and 120 cycles per second', a maximum depth of '<500 feet', suitability for 'unconsolidated and soft/fractured bedrock', and a rate of penetration 'around twice as fast as air rotary and 8 to 10 times faster than hollow-stem auger and cable tool', though slower than mud rotary.

Where it falls downThe core is structurally disturbed, not undisturbed: the vibration disturbs soil structure along the borehole wall, distorts the sample during extraction, and in rock can create mechanical fractures that affect permeability testing. Drilling-induced heat in dense dry ground compromises sampling for volatile organic compounds. An ASTM practice for sonic drilling exists, but no accessible copy could be opened for this page, so nothing here is quoted from it. The federal source adds that 'driving of material into borehole wall when using a drill bit might create problems for logging, aquifer testing, and may affect monitoring well filter pack'. Drilling rock needs supplementary water or air to clear cuttings. Because the core is compacted by vibration, apparent recovery can exceed the interval drilled — recovery figures from sonic holes need care.

source

Auger drilling — solid-stem and hollow-stem

Turns a continuous helical flight into soil, carrying cuttings to surface on the flights. Solid-stem augers make a cheap shallow hole; hollow-stem augers leave the flight in the ground as a temporary casing so that undisturbed samplers, in-situ tests and monitoring-well casing can be run down the middle of the auger column.

Specification, and where it falls down

SpecificationSolid-stem gives disturbed cuttings; hollow-stem gives disturbed cuttings plus whatever sampler is run down the stem, so it can deliver an intact tube sample. ASTM gives hollow-stem auger a 'maximum depth of drilling of 200 to 300 ft (60 to 90 m) depending on torque and pull down/retract capacity', and notes that 'in situ testing or other soil sampling methods can be performed through the hollow auger column below the lead auger assembly' — split-barrel, thin-wall tube and vane shear without pulling the augers. USGS notes the hollow stem 'remains in the ground to act as a casing and hold out any potential caving materials'.

Where it falls downUnconsolidated ground only — augers stop at rock, cobbles and boulders. Solid-stem cuttings are not a depth-resolved sample: USGS warns that the 'sample returned to the surface will not represent true lithologic conditions' because of segregation and mixing on the flights, and the hole caves in saturated zones. Hollow-stem drilling in saturated sands suffers heave and piping up the stem; ASTM records that 'saturated cohesionless soils such as clean sands may flow and cave during drilling'. USGS also notes '2-3 in. of material loosened by the pilot bit. has not been moved up the auger flight', which contaminates the top of the next sample. Augers can drag contaminants downward.

source

Direct push (probe / percussion-hammer sampling)

Pushes or hammers a small-diameter sampler into soil with no rotation and no cuttings, using the rig's static weight, a percussion hammer, or vibration. Used for contaminated-site investigation because it makes almost no investigation-derived waste and disturbs a small footprint.

Specification, and where it falls down

SpecificationGives a lined core of soil, continuous or discrete-interval. ASTM describes advancement by 'static push, or impacts from hammers, or vibratory methods, or a combination thereof', and covers both single-tube and dual-tube systems, with dual-tube preferred because 'the outer tube stays in place to protect and seal the borehole and prevents potential cross contamination'. ASTM D6286/D6286M-20 notes that 'Direct Push methods were developed because they develop minimal investigative derived waste (IDW)'. Samples support contaminant analysis, classification to ASTM D2488 and lithologic logging. note: ASTM D6282 does not state a maximum depth or standard sampler diameters, so none is quoted here.

Where it falls downCannot penetrate solid rock, and is only marginally effective in 'partially weathered rock or very dense soils' and in 'compact gravelly tills containing boulders and cobbles, stiff clay, compacted gravel, and cemented soil'. Samples are compressed and sheared by the push, so they may not be suitable for laboratory engineering-property testing (Classes C and D of ASTM D4220). Small sample mass. Depth is limited by the rig's reaction weight and by rod friction, both of which rise quickly in dense ground.

source

Geotechnical split-barrel sampling and the Standard Penetration Test (SPT)

Drives a split-barrel sampler into the base of a borehole with a standard falling weight, recording the blow count. It returns a disturbed soil sample for identification and, in the same operation, an index of soil density and consistency that underpins most foundation design in the United States.

Specification, and where it falls down

SpecificationGives a disturbed but depth-certain soil sample. ASTM D1586 specifies a '140 lb [63.5 kg] hammer dropped 30 in. [750 mm]' onto a '2 in. [50 mm] diameter sampler'. The N-value is the number of blows to drive the sampler through 'the depth interval of 0.5 to 1.5 ft [0.15 to 0.45 m] of a 1.5 ft [0.45 m] drive interval' — that is, the first 6 inches are seating and are discarded, and the N-value is the sum of the second and third 6-inch increments.

Where it falls downApplies 'to non-lithified soils with maximum particle sizes less than approximately half the sampler diameter' and 'is limited to non-cemented materials' — gravel, cobbles and cemented soils give meaningless, inflated blow counts. The sample is disturbed and unusable for strength or consolidation testing. N-values are sensitive to hammer energy transfer, rod length and borehole cleanliness, so raw N is normally corrected before use. It is an index test, not a measurement of any fundamental soil property.

source

Blasthole and production drilling

Drills the pattern of holes that will be charged with explosive to break a bench in an open pit or a round underground. The cuttings from each hole are also the cheapest grade-control sample available on an operating mine, which is why blasthole sampling is used for ore/waste routing even though its sample quality is poor.

Specification, and where it falls down

SpecificationGives chips piled at the collar; destructive. A university mining-engineering course gives bench blasthole diameters that 'typically range from a low of 3" to a high of 15"', with underground work at the low end and surface operations in the middle to upper range. The same course gives the standard design relations as burden B = K_B x D, spacing S = K_S x B and stemming T = K_T x B, where D is hole diameter, with K_B = 20 underground or 25 at surface for ANFO in rock of density 2.5 g/cm3, K_S = 1 to 1.3 and K_T = 0.7 — and it stresses these 'provide guidance rather than absolute precision and require iterative refinement'. Surface blastholes are normally drilled by rotary tricone or by down-the-hole hammer.

Where it falls downThe blasthole cuttings pile is a biased sample by construction: material from the whole hole is mixed at the collar, fines are lost to dust and wind, subdrill below the planned floor contaminates the pile with waste or with the next bench's ore, and the pile is sampled by whatever ad-hoc method the crew uses. Depth resolution within the hole is effectively nil. Blasthole assays are used for short-range ore/waste decisions, not for resource estimation.

source

Cable tool (percussion) drilling

The oldest mechanised method still in service: a heavy string of tools is repeatedly lifted and dropped on a cable to pound the hole deeper, with cuttings bailed out periodically and temporary casing driven behind the bit. Still used for water wells and for environmental holes where no drilling fluid is wanted.

Specification, and where it falls down

SpecificationGives cuttings from the bailer, or a driven sample if a split-spoon or drive barrel is used. A federal interagency reference gives a maximum depth of '<5000 feet', a 'minimum 4-inch casing' for hard tooling, and rates of penetration of '1.5 to 2.5 feet per hour for bedrock and dense tills', '2.3 to 3.3 feet per hour for gravel and tills' and '3.5 to 4.5 feet per hour for silts, clays, and sands'. Hard tooling works 'in any formation including basalt'; the drive-barrel variant suits 'relatively dry, unconsolidated soils such as sand and gravel'. Because no circulation fluid is used, the method does not spread contamination between zones and can be run by one operator.

Where it falls downVery slow — the penetration rates above are per hour, not per minute. Hard-tooling samples are explicitly 'low in quality'. Requires relatively large-diameter steel casing, which corrodes under aggressive contaminant conditions and is hard to decontaminate. 'Heaving of material from the bottom of the casing upward might require special measures' in saturated sands.

source

The protocols that decide whether a result is trustworthy

The procedures between a sample and a number you can rely on

Core orientation

Establishing, in the core tray, which side of the core faced the bottom of the hole, so that planar features measured on the core can be converted into true dip and dip direction in the ground. Without it, a vein or fault measured in core has a known angle to the core axis but an unknown compass bearing.

What the procedure actually requires

A bottom-of-core (BOC) mark is placed downhole, in practice 'after each core run of a few m'; the marks are then joined to form 'an orientation line. marked along the bottom of the core', with 'arrows. marked on the orientation line to indicate the down-hole direction'. Structures are then recorded as two angles: alpha is 'the angle between a line parallel to the length of the core (the core axis) and the plane', and beta is 'the angle measured clockwise looking down core from the BOC line to the down-core axis of the ellipse formed by the intersection of the plane and the core'. Measurement is quick — 'the whole process of extracting a piece of core from a core tray, measuring alpha and beta, and returning the core to the tray can be carried out in less than a minute'. CIM's exploration guidelines, which are advisory Canadian guidance adopted under NI 43-101 and are not a requirement for a US operator, note that for structurally controlled deposits 'oriented core provides better spatial description of structural features'. Marking conventions and tool types (mechanical scribe, spear, digital/accelerometer) vary between projects — this is industry convention, not a published standard.

source

Core recovery and RQD measurement

Two numbers recorded for every core run that together say how much rock came out and how broken it was. They are the primary evidence that an assay interval is representative, and the primary warning that it is not.

What the procedure actually requires

Total core recovery = summed length of recovered core divided by the length of the run, as a percentage. RQD is the percentage of a core run recovered as intact pieces equal to or greater than 100 mm (4 in.) long, those lengths being summed and divided by the total length of the core run. ASTM D6032/D6032M-17, the test method that governed RQD measurement, was withdrawn by ASTM in 2026 with no replacement, so there is currently no active ASTM RQD standard; while it was in force it required pieces to be measured 'along the centerline of the core' to the nearest 1 mm, so the result does not depend on core diameter; only natural breaks count, and 'core pieces on either side of core breaks caused by the drilling process shall be fitted together and counted as one piece'; weathered, porous or friable pieces are excluded from the sum. NX (54.7 mm) and NQ (47.5 mm) are the optimal sizes, BQ to PQ (36.5 to 85 mm) are 'normally acceptable', and 'the RQD calculated for core smaller than BQ may not be representative'. The standard is candid about its own precision: repeatability and reproducibility by rock type run from r = 14%, R = 14% for limestone to r = 32%, R = 40% for calcareous shale, and 'there is no accepted reference value for this test method; therefore, bias cannot be determined'. Broad quality bands of RQD above 75% for high-quality rock and below 50% for low-quality rock are in general use.

source

Downhole deviation surveying

Measuring the actual path of the hole. Holes bend — a hole collared at 60 degrees can be several tens of metres away from where the plan says it is by the time it reaches the target. Every assay in the hole is placed in space using the survey, so an unsurveyed hole puts its grades in the wrong place.

What the procedure actually requires

Two angles are recorded at intervals down the hole: 'inclination: the angle from vertical' and 'azimuth: the directional orientation'. Instruments use three sensor families: triple-axis accelerometers, which 'measure the static and/or dynamic forces of acceleration' in three directions to give tilt relative to gravity; magnetometers, which act as electronic compasses using 'magnetic-field strength measured in three orthogonal directions'; and gyroscopes, which EPA describes as supplementing magnetometer data in boreholes with steel casing or magnetic minerals. The consequence of sloppy surveying is non-linear, although the one published figure available comes from a different application: EPA records that 'for common HFM geometries' (hydraulic fracture mapping, not mineral drill-hole positioning) 'a 5 degree deviation uncertainty of monitoring or treatment wells can cause more than 40 degree uncertainty in inverted fracture azimuths'. CIM guidance, which is advisory Canadian guidance under NI 43-101 and not a US requirement, states that 'drill hole deviation surveys should be undertaken at regular intervals downhole using techniques and instrumentation suited to the hole size, angle and length of holes' and recommends, at post-discovery stage, 'an orientation study that examines the accuracy of the drill hole deviation as a function of down-hole deviation measurement spacing'. The common survey interval of roughly every 30 m is convention, not a published requirement — CIM deliberately declines to specify one.

source

Core photography and geological logging

The permanent visual and descriptive record of the core. The photograph is taken before the core is cut, because cutting destroys the only undisturbed state the core will ever be in; the log is the geologist's interpretation, which a later reviewer must be able to test against the photograph and the core itself.

What the procedure actually requires

CIM's Mineral Exploration Best Practice Guidelines, which are advisory Canadian guidance adopted under NI 43-101 and not a requirement for a US operator, recommend that 'photographs of the drill core prior to splitting should also be taken as part of the logging process and stored for future reference', that 'logging of drill core or sample chips should be carried out by qualified and competent personnel that have both the proper training and sufficient experience', and that logs record 'lithologies, alteration types and intensities, mineralization types and intensities' along with core or sample recoveries. ASTM D5434 sets out 'the type of information that should be recorded during field subsurface explorations in soil and rock' but is a guide, not a specification, and states plainly that 'all of the information given in this guide need not appear in all field logs' — content depends on the purpose of the investigation. The West Virginia DEP Geology Handbook, a state surface coal mining regulatory handbook rather than a general standard, requires a geological log to record 'depth and thickness of all strata', a full description of each including lithology, colour, grain size, mineralogy and degree of weathering, and 'the occurrence, depth, and estimated yield of any water-bearing zones'; sample labels must carry at minimum site or project name, drill hole number, drilling date and the sampling interval or identification number. US National Park Service curation guidance records that 'the U.S. Geological Survey (USGS) uses unwaxed cardboard boxes that are 3 feet long and 1 foot wide for slabbed cores', and that 'generally, 10 feet of slabbed 3 - 4 inch size cores can be stored in a 3 foot by 1 foot box', each box marked with 'catalog numbers, identifying names and numbers, basic locality information, and depths of core contained in the box', and the depth and position of any removed section marked inside the tray.

source

Core cutting, sampling intervals and half-core retention

Deciding where each assay sample starts and stops, splitting the core along its length, sending one part to the laboratory and keeping the rest. The retained half is the only physical evidence that survives for a re-check, and the interval boundaries determine what the assay actually means.

What the procedure actually requires

Core is sawn or split longitudinally; 'half of the split core is assayed, while the other half is permanently stored for future use and re-assaying if necessary'. NPS curation guidance makes the retention rule explicit: 'split the core lengthwise, with at least one half remaining in the box so that a continuous vertical portion of the core remains', avoiding total loss of any interval. The West Virginia DEP Geology Handbook, a state surface coal mining regulatory handbook, likewise describes splitting 'with one-half being crushed, and the other one-half (or more) retained intact', and requires cleaning of 'the core splitter, hammer, and plate with a wire brush and compressed air prior to use and between samples'. On interval selection, CIM's exploration guidelines, advisory Canadian guidance under NI 43-101 and not a US requirement, recommend that operators 'ensure that a complete and uninterrupted series of samples are collected through the anticipated mineralized interval, along with a sufficient number of samples of unmineralized material on either side' — that is, sample through the barren shoulders, not just the visible ore. The same West Virginia surface coal mining handbook requires that 'lithologic units exceeding five feet in thickness should be broken into smaller composite intervals with each composite interval not exceeding five vertical feet' - a coal-overburden rule, not a general sampling rule. Sampling to geological contacts rather than to fixed lengths, and the common 1 m default interval, are convention rather than rule.

source

Hole abandonment and decommissioning

Sealing a hole when drilling stops, so it cannot become a vertical conduit connecting aquifers, a pathway for surface contamination, or a hazard. Most US states regulate hole abandonment by statute or rule, so the obligation and its details depend on the state the hole is in and on the type of hole.

What the procedure actually requires

ASTM D5299 covers 'permanent decommissioning (closure)' of monitoring wells, observation wells, piezometers, injection wells and boreholes, with the objectives of preventing reuse, blocking 'contaminant migration between aquifers or into the vadose zone', and eliminating 'the possibility that the well is used for purposes other than intended'. Sealing materials include cement-sand grouts, neat cements, bentonite chips and bentonite slurries with 20% or more solids; the standard warns that 'all sealing methods suffer from some shrinkage in the portion of the well in the unsaturated zone' and cautions against low-solids bentonite slurries there. Mix designs, cure times and prohibited fill materials are set state by state, and a driller must work to the rule of the state the hole is in; no single national specification exists, and none is reproduced here. ASTM adds the honest caveat that 'it may not be practical to verify the integrity of the decommissioning procedure'.

source

Specifications worth knowing

Technical figures, each linked to the document it came from

  • 100 mm (4 in) and 1 mmThe RQD threshold - only intact core pieces equal to or greater than 100 mm count - and the resolution to which those pieces are measured along the core centreline under ASTM D6032/D6032M-17. Note that ASTM withdrew D6032/D6032M-17 in 2026 with no replacement, so this is the last published form of the test method rather than a current standard.source
  • 140 lb [63.5 kg] hammer, 30 in [750 mm] drop, 2 in [50 mm] sampler, 0.15-0.45 m of a 0.45 m driveThe complete SPT specification under ASTM D1586: the energy source, the sampler, and the exact interval over which blows are counted to give N.source
  • 50 to 120 cycles per second; maximum depth <500 feet; 8 to 10 times faster than hollow-stem auger and cable toolSonic drilling vibration frequency, depth capability and relative rate of penetration, from a US federal interagency technology reference.source
  • 200 to 300 ft (60 to 90 m)Practical maximum depth for hollow-stem auger drilling under ASTM D6151-25, limited by the rig's torque and pull-down/retract capacity.source
  • 3000 to 4000 ft/minute air velocity; cuttings ½ inch or less; sampled continuously at 1-foot intervalsAir rotary operating specification from the West Virginia DEP Geology Handbook - a state surface coal mining regulatory handbook written for West Virginia's surface mining reclamation regulations, not a general or federal drilling standard: the uphole air velocity needed to lift cuttings, the expected cutting size, and the sampling interval.source
  • 1.5-2.5 ft/hour in bedrock and dense till; 2.3-3.3 ft/hour in gravel and till; 3.5-4.5 ft/hour in silt, clay and sand; maximum depth <5000 feetCable tool penetration rates by ground type and its depth capability — the numbers that explain why a method that can reach 5000 feet is almost never used to do so.source
  • 3 inches to 15 inches; K_B = 20 (underground) or 25 (surface), K_S = 1 to 1.3, K_T = 0.7Bench blasthole diameter range and the K-factors relating burden, spacing and stemming to hole diameter in standard blast design, from a university mining engineering course that stresses these are guidance requiring iterative refinement.source

How it is actually bought

Contract shapes and what they price

Drilling is almost always bought on a schedule of rates rather than a lump sum: a footage or metre rate that steps up with depth and hole size, plus separate hourly or daily rates for standby, reaming, casing, cementing, downhole surveying and rig moves, plus consumables (bits, core barrels, casing left in the hole, drilling fluid and additives) charged at cost or at listed unit prices. Mobilisation and demobilisation are quoted as a lump sum per rig, and they are owed whether or not the programme runs to length — a two-rig programme cancelled after one hole still owes both mobs. Who supplies water, access roads, drill pads, fuel and the sump is a separate negotiation, and on remote ground the owner commonly carries water haulage and pad construction. A normal engagement runs: scope and target list from the geologist, method and hole-size decision, permit and access clearance, rig and crew selection with an agreed rate schedule and a minimum-metres or minimum-days commitment, mobilisation, daily drill reports reconciled against the rate schedule, core or chips handed over to the logging and sampling crew, then hole abandonment and pad reclamation to the standard the land manager requires. Ground-condition risk is allocated by the contract, not by default. Lost circulation, cave-ins, stuck rods and re-drills are commonly billed at standby or at agreed remedial rates, which is how a low per-metre rate and a high final invoice end up in the same programme. Insurance certificates, MSHA training records and the contractor's MSHA identification number are normally conditions precedent to mobilising onto mine property.

Who regulates it

And what each one requires of this trade

The standards that apply

Ask which of these a firm works to

What to demand from a firm

Credentials worth checking before you sign

Where to find firms yourself

Public registers and member directories

  • NGWA / Wellowner.org water well contractor directory — Public directory of NGWA member contractors searchable by location and by service type (well drilling, service and repair, pump equipment, water testing), with a state-by-state browse; the site itself warns you to verify state compliance separately.
  • National Drilling Association (NDA) — Nonprofit trade association of contractors, manufacturers and affiliates across the geotechnical, environmental and mineral exploration drilling sectors, with a chapter directory — the right starting association for non-water-well drilling.
  • ADSC — The International Association of Foundation Drilling, 'Find a Contractor' — Searchable contractor, associate and technical affiliate directories for the drilled shaft, anchored earth retention and micropile side of the trade, which is who you want for large-diameter geotechnical and shaft work.
  • MSHA Mine Data Retrieval System (MDRS) — Free public system for pulling a contractor's MSHA inspection, violation and accident history — you can search by contractor name if you do not have the contractor ID, which makes it the cheapest safety due diligence available.

Numbers worth knowing

Each one carries its source

BQ 36.5 mm, NQ 47.6 mm, HQ 63.5 mm, PQ 85 mm core (in 60, 75.7, 96 and 122.6 mm holes)

Standard wireline core and hole diameters; larger core gives better sample support but needs more rig power and reduces achievable depth for the same rig.

source
24 hours new-miner training (min. 4 hours before starting work) and 8 hours annual refresher

MSHA Part 46 training minimums the drilling contractor must have delivered to its own crew before they work on your mine site (§§ 46.5, 46.8).

source
5 acres of disturbance and 1,000 tons of bulk sample

The BLM 43 CFR 3809 thresholds: at or below these you can operate under a notice; above them you need an approved plan of operations, which is a materially longer and more expensive path.

source
$100 application / 3-year term for an ATF user permit; $25 / 12 months for a limited permit; up to 90 days to decide an application

Federal explosives permit costs and lead time — relevant if your blasthole programme includes receiving explosives, because the 90-day window can gate the start date.

source
26,001 pounds GVWR/GCWR

The federal threshold at which moving a rig or support truck requires a Class A or B commercial driver's licence (Class A where the towed unit exceeds 10,000 lb); hazmat placarded loads require Class C at minimum plus an H endorsement.

source

How this goes wrong

The specific traps, not general advice

  • Buying a footage rate without pinning down the standby, reaming, casing-left-in-hole and re-drill rates, then discovering that the cheap per-metre number only applies to trouble-free ground and that two weeks of bad ground cost more than the drilling.
  • Paying mobilisation twice because the programme was scoped hole-by-hole instead of as a block, or because permits and access were not cleared before the rig was released — mob/demob is a lump sum per rig and it does not care that you only drilled one hole.
  • Specifying too small a core size (BQ or NQ) for a deposit that needs HQ or PQ sample support, then finding the assay variance is unusable for a resource estimate and the whole programme has to be redrilled at the larger diameter.
  • Letting the driller mobilise without checking the MSHA contractor ID and dated Part 46/48 training certificates, so an MSHA inspector stops work on your site and the production operator wears part of the exposure.
  • Assuming the old familiar standard still exists: ASTM D2113, the long-cited practice for rock core drilling and sampling, was withdrawn in 2023 with no replacement, so a scope that simply says 'core per ASTM D2113' now references nothing enforceable.

The vocabulary

Defined by someone who is not selling you anything

RQD (Rock Quality Designation)
The percentage of a core run recovered as sound, intact pieces 100 mm (4 inches) or longer, measured along the core's centreline. Introduced by D.U. Deere in 1964, it is the standard shorthand for how broken the rock mass is: above about 75% is regarded as high-quality rock, below about 50% as low-quality.
Core loss
The difference between the length of hole drilled in a run and the length of core that comes out of the barrel. It is not neutral: core is lost preferentially from faults, shears, clay-altered and oxidised zones, which are often the mineralised ones, so core loss tends to bias grade rather than merely add noise.
Wireline
A core drilling system in which the inner tube containing the core is winched to surface up the inside of the drill rods on a cable, instead of pulling the whole rod string out of the hole for every run. It is what makes deep core drilling economic, and it is the reason the rods themselves are the casing.
Casing
Pipe left in the hole to hold unstable ground open, seal off water, or isolate one zone from another. It can be temporary (driven ahead of the bit and pulled on completion) or permanent (grouted in). Hollow-stem augers act as their own casing while drilling.
Standpipe
A short length of casing set and grouted at the top of a hole. It stabilises the loose ground at surface, gives the drill string a fixed guide so the hole starts at the intended angle, and returns drilling fluid or cuttings to the collar in a controlled way.
Collar
The point where the hole meets the ground surface, and by extension the surveyed coordinates and elevation of that point. Every depth down the hole is measured from the collar, so a collar surveyed to the wrong position puts the whole hole in the wrong place.
Azimuth and dip
The two angles that define the direction a hole is pointing. Azimuth is the compass bearing of the hole in plan; dip (or inclination) is its angle below horizontal. Both change as the hole deviates, which is why they are re-measured down the hole rather than assumed from the collar setup.
Survey (downhole)
A measurement of azimuth and inclination at a stated depth in the hole, used to reconstruct the hole's real three-dimensional path. Taken with accelerometers and either magnetometers or, where magnetic rocks or steel casing make a compass useless, gyroscopes.
Lost circulation
The condition where drilling fluid pumped down the hole does not come back — it escapes into open fractures, cavities or very coarse gravel. Cuttings then stop returning to surface, sampling stops, and the hole can collapse. It is the main reason mud rotary is unsuitable for fractured or cavernous ground.
Rod string
The connected column of drill rods running from the rig to the bit. It transmits rotation, thrust and fluid or air, and in a wireline system it also houses the inner tube. Its weight, stiffness and length govern how much the hole deviates and how deep the rig can drill.
Bit types
The cutting tool at the end of the string. Impregnated or surface-set diamond bits cut rock for coring; tricone roller bits crush rock for open-hole rotary; drag or blade bits shear soft ground; and down-the-hole hammers pound the rock with a piston driven by compressed air, which is what makes percussion RC and most blasthole drilling work.
Down-the-hole (DTH) hammer
A pneumatic hammer placed immediately behind the bit so the piston strikes the bit directly rather than sending energy down the rods. It produces straighter, cleaner holes than top-hammer drilling; air versions are generally limited to holes shallower than about 200 m and run at high air pressures.
Sump
The excavated pit beside a drill rig that catches returning drilling fluid and cuttings and lets the solids settle so the fluid can be re-circulated. It is also the thing that must be rehabilitated afterwards, and a common condition in exploration permits.
Twinned hole
A hole drilled deliberately alongside an earlier one, usually by a different method or a different operator, to test whether the original results can be reproduced. It is a standard way to check legacy data or to compare RC against diamond core. CIM lists 'twinning of holes' among the methods for verifying earlier drilling.
Core run
One advance of the core barrel between retrievals — the unit over which recovery and RQD are calculated. A formation change or a zone of interest can also define where a run starts and stops.
Half core
The longitudinal half of the core sent for assay, the other half staying in the box. Sampling half the core halves the sample mass, which matters in nuggety mineralisation; taking whole core gains mass but destroys the ability to re-check the interval, so it is done sparingly.
Cyclone and splitter
On an RC or air core rig, the cyclone is the conical vessel that separates cuttings from the returning air stream; the splitter beneath it (riffle or rotary cone) divides the falling cuttings into a laboratory sample and a retained bulk reject. Nearly all RC sampling error that is under the crew's control happens here.
N-value (SPT blow count)
The number of blows of a 140 lb hammer falling 30 inches needed to drive a standard split-barrel sampler through the second and third 6-inch increments of an 18-inch drive. It is an index of soil density and consistency, not a fundamental property, and it is meaningless in gravel, cobbles or cemented ground.

Questions to ask before you sign

  • Which rig types do you own outright, and what depth capacity?
  • Can you show recovery rates from a recent programme in similar ground?
  • Who handles core logging, cutting and chain of custody to the lab?

Where to next

Every figure and requirement on this page is linked to the agency, standard or register it came from. Nothing here is legal advice, rules change, and a link is worth more than our summary of it — follow them.